Newly built approach road to bridge caves in after heavy rains in Dehradun
The repaired bridge and the newly constructed approach road were built at a combined cost of ₹16 crore

National · 1 updates
The repaired bridge and the newly constructed approach road were built at a combined cost of ₹16 crore