inThreadNews covers India today. Want it for your country? Tell us — enough requests and we'll add it.
/
Loading story
Mumbai-Ahmedabad bullet train project
National · 11 updates
Mumbai-Ahmedabad bullet train to start with Indian trains, Japan to provide E10 series in 2030: MEA
Japan ex-minister claims ‘recklessness’ on bullet train project, India rejects
Mumbai-Ahmedabad bullet train project: Second TBM begins excavating India’s first undersea tunnel
Bullet Train corridor being equipped with advanced electrification system: NHSRCL
The advanced 2×25 kV Overhead Traction System, being introduced in India for the very first time, is designed to provide a stable and uninterrupted power supply required for trains operating at speeds of up to 320 kmph, NHSRCL officials said
NHSRCL Speeds Up On The 508-km Mumbai-Ahmedabad Major Bullet Train Electrification Project
Mumbai-Ahmedabad bullet train corridor to get India’s first high-speed electrification for 320 kmph operations
Centre plans standard design for bullet train network across 7 new corridors
Mumbai-Ahmedabad bullet train: Bombay HC allows mangrove felling for power line
Mumbai-Ahmedabad bullet train: Bombay HC allows mangrove felling for power line
Bombay HC Clears Felling Of 847 Mangroves For Mumbai-Ahmedabad Bullet Train Project, Says Distant Afforestation Cannot Replace Local Ecology
Mumbai-Ahmedabad Bullet Train Project: Thane, Surat And Sabarmati To Form Three-Depot Maintenance Network
Bullet train project construction integrates with railway network at Vadodara
The 14 portal beams have been constructed along the complex Vadodara stretch, where the Bullet Train alignment crosses multiple operational railway lines.
No stories here — try another tab, category, or search.
Loading more stories…
Request a feature
What would make inThreadNews better for you? We read every request.